E-Ring Road diversion

The Public Works Authority (Ashghal) has announced the closure of part of E-Ring Road in the direction from Energy Intersection towards Airport Street from tomorrow for six months. Traffic will be diverted to the opposite side of the road to include two lanes in each direction. The closure, in co-ordination with the General Directorate of Traffic, is to allow construction works for surface and groundwater network at Al Thumama. Ashghal will install road signs advising motorists of the temporary closure and has urged all to follow these and abide by the speed limit to ensure safety.

As seen on GulfTimes  Image Credits GulfTimes